Viaduct Gully Drainage — Calculation & Shop Drawing System
Opens with the viaduct gully study (GL-107 … GL-120). Changes are saved in this browser automatically.
Interactive Engineering Simulations
A growing collection of interactive 3D / 4D engineering simulations, digital twin studies and project work — built, run, and validated in the browser.
Explore the simulations
Live, interactive dashboards to plan, track and manage projects.
Bespoke KPI & management dashboards tailored to your data.
Pipelines, modelling and analytics — clean, reliable data.
Real-time project trackers with progress, status and alerts.
End-to-end custom SaaS apps, built fully to your workflow.
BIM-driven construction twins with 4D sequencing & EVM (4DZEN).
Real-time digital twins mirroring physical systems & assets.
Parametric, rule-driven 3D models that update as inputs change.
Process & method engineering to optimise construction workflows.
Interactive 4D animations of the construction sequence.
Opens with the viaduct gully study (GL-107 … GL-120). Changes are saved in this browser automatically.
An academic simulation & analysis study of gravity batteries and sustainable wind farms — examining how gravity and wind loading act on a wind-turbine + gravity-vault + battery energy system, with real-time parameters and live data charts.
Interactive 3D wind-turbine simulation — Betz limit and Cp curve, aerodynamic loads, wind streamlines and live power / energy charts.
My own product: a 4D construction management & visualisation platform that fuses BIM, 4D sequencing, and Earned Value Management — PLANNED vs ACTUAL 3D views, live CPI/SPI, cash-flow curves, critical-path analysis, and discipline progress.
Interactive labs (robot arm, welding robot), Streamlit apps and academic studies live in the research archive — growing over time.
Go to Research & Studies